Services

Pipeline Evacuation

Reserve completed its first pipeline evacuation project in 1975. We have performed evacuation services at thousands of sites, using from one to ten portable units. We have evacuated lines as short as a single pig trap and as long as 700 miles.

We have evacuated lines from 4 to 48 inches in diameter, with initial pressures ranging from 50 to 1350 psig down to less than 10 psig when required. Some require weeks of operation while others less than one hour.

A typical project is completed in 48 hours. Our operations department will provide various options to meet our customers’ needs.

Our servcies also include degassing, pipeline blow down, pump down etc


  About

The Reserve companies are industry leaders in pipeline evacuation, temporary Compression and LNG vaporization services

  Reserve Equipment Services

13310 Hempstead Highway
Houston, Texas 77040

Tel : (713) 939-8988

Fax : (713) 939-8994
Mail : ops@reserveequipment.com